HORIZON OFFSITE LTD. Our Work

Ramsgate Phase 1 & 2
Location:

Kent

This project consisted of two phases. Phase 1 consisted of 22 residential apartments. This phase just took 10 weeks onsite to complete. The second leg of this phase started in March of this year, works are ongoing and due for completion late August.  This phase had a more intricate design, and it consisted of forty two, two and three story housing units spanning over 80,000 square foot. Both concrete floors and light gauge floor were incorporated into this design. Like all our projects all walls and floors were preformed offsite in our facility and transported on site ready for installation.

Carrick Desmond
Location:

Newcastlewest, Ireland

This is an ongoing Irish Project in Newcastlewest. This project involves the manufacturing and construction of ten residential units consisting of detached and semidetached properties with in Carrick Desmond housing estate. The manufacturing process taken two weeks and is it expected that the construction on site in Carrick Desmond will take two weeks.

Hale Court
Location:

Edgware, London

Horizon Off-site were contracted to provide the design manufacture and installation of the light gauge steel structure for 12 Apartments in Edgeware Road London.  Located on a extremely tight site, the challenge for Horizon Off-Site was to construct using a panelized system.  The Horizon Off-site solution was a factory assembled pre-insulated certified load bearing wall, floor and roof system.  The Key driver of the design solution was the speed and lightness of the construction. All walls and floors were Pre-formed in Horizon off-site factory and shipped to site ready for assembly. The main challenge was working with two different types of sub structure. Keeping the £250,000 budget in focus and the 6 week build time were critical milestone that were achieved

Feirnbarnet Apartments
Location:

Barnet, UK

The Feirnbarnet Apartments in Barnet, London involved the manufacturing and installation of ten residential apartments. This project was located on a particularly tight site, this made meeting the deadline line of a 4 week build time challenging, however this was another goal reached by Horizon Offsite.  The manufacturing process for the 10 apartments took 3 weeks in our purpose built facility . Having all walls and floors and roofing pre formed in our factory and transported to site ready for installation shortens build time on site considerably. 

Lawlors Hotel 
Location: Naas, Co. Kildare 

An ongoing project for Horizon Offsite, scope of this project consists of an expansion to a pre-existing Hotel structure. Horizon will be adding 48 bedrooms and a conference room. While the existing building remains operational the challenges posed include logistic servicing a confined site, panalisation offsite reduced the noise pollution during construction. Our client Milltown New Homes chose Horizon Offsite’s Light Gauge Steel systems for speed and convenience to eliminate these challenges. All floors, full structural walls and all hot rolled steel were pre-fabricated offsite and transported from our manufacturing plant to site ready for installation cutting down time needed on site by 50 %. Horizon Offsite is expected to be completed onsite by mid-August, update to follow upon completion.

 

 

 

Horizon Offsite Light Gauge Steel Manufacturing in Cahir Tipperary Ireland 

Do You Have A Construction Project We Can Help With?
Telephone:+353 52 7441424 E-mail: info@horizonos.ie

Do You Have A Construction Project We Can Help With?

Tel: +353 52 7441424

E: info@horizonos.ie

Horizon Offsite Light Gauge Steel Manufacturing in Cahir Tipperary Ireland

The design and engineering of all our projects are inhouse in our state of the art facilities in Cahir, Co. Tipperary, Ireland. Our facility has the capacity to produce 300,000 square meters of Light Gauge Steel Product per annum based on one 8 hour shift. This is equivalent to 2,000 standard Residential units per annum.
We cater and supply to the Irish, UK and European markets

Horizon Offsite Light Gauge Steel Manufacturing in Cahir Tipperary Ireland

The design and engineering of all our projects are inhouse in our state of the art facilities in Cahir, Co. Tipperary, Ireland. Our facility has the capacity to produce 300,000 square meters of Light Gauge Steel Product per annum based on one 8 hour shift. This is equivalent to 2,000 standard Residential units per annum.
We cater and supply to the Irish, UK and European markets

Unit A, Cahir Business Park,
Caherabbey Lower, Cahir,
Co. Tipperary, E21 TF89, Ireland

Unit A, Cahir Business Park,
Caherabbey Lower, Cahir,
Co. Tipperary, E21 TF89, Ireland

Telephone:+353 52 7441424
E-mail: info@horizonos.ie

Telephone:

+353 52 7441424
E: info@horizonos.ie